What to do before a website redesign
The week of preparation that decides whether a redesign gains traffic or loses it.
A redesign that starts with a mood board and ends with a launch date is a redesign that loses traffic in between. The work that protects it happens before either.
First, export the list of pages that currently receive traffic. Not every page: the ones with visits, links or enquiries. That list is the minimum that must exist after launch.
Second, export the titles and descriptions of the pages that rank. They will change in the redesign, and some of them are the reason the page ranks at all.
Third, write the redirect map. One line per old URL to its new home. This is a spreadsheet task, not a developer task, and it is the single most valuable hour in the project.
Fourth, decide what to stop doing. The chat widget, the popup, the four tracking scripts. A redesign is the cheapest moment to remove weight from the site.
Only then does the design start. By that point the brief is a list of pages and the questions they must answer, and the visual work has something to be beautiful about.

Checklist
- Export pages with traffic
- Export ranking titles and descriptions
- Write the redirect map
- Decide what to remove
Print it, or send it round your management team.
Questions this raises
How long before launch should this happen?
Two weeks. A week is possible, a day is how traffic is lost.
Do we need to keep the old site running?
Yes, until the redirects are tested. A staged launch is cheaper than a recovery.
Talk to a person, not a pipeline
Call, text or email. You reach our team, with a named manager on every account, and you will be told honestly whether we can help.